This page contain information copyrighted by other individuals and entities. Copyrighted material displayed in this page is done so for archival purposes only and is not intended to infringe upon the ownership rights of the original owners.
Port of Total Gas Pier - Vietnam (ID: 940)
Page 1 of 1 [Back to companies list]
Total Gas Pier For LPG Pilot Station coordinates Same as Haiphong main port down stream of Haiphong main port 02miles (next to Chua xe portl) Distance from Pilot Station 24miles Restriction LOA: 110m Normally vessel berthing with draft 4.0-4.5m. Suitable fo vessel under 5,000 DWT.Main channel draft 4.5m at berth 2.5m (under chart fatum). Vessel berthing draft=main channel draft+high tide-0.2m UKC. H'ever, main channel draft and draft at berth here always changing. For LPG: One shore line for receiving LPG, Shore tank cap: apr. 5,000cbm One shore line for receiving LPG, Shore tank cap: apr. 5,000cbm. Port of Total Gas Pier - Vietnam